- NWP is committed to sharing the area with other land-uses including Indigenous traditional use, trapping, hunting, and recreation.
- NPW’s access plan will not restrict access to Grave Lake, the campground, or the private cabins.
- The Project’s load out would be located just over 2 km from the Grave Lake Campground (further than Teck’s Line Creek Processing Plant and associated facilities). The load out would include:
- a covered clean coal stock pile to reduce dust and water quality impacts
- a loading silo over a railway track to load 2 to 3 trains per week
- a conveyor to move clean coal from the stockpile to the silo
- The load out would be in an area that has previous disturbance. It has been laid out to reduce new disturbance and to avoid archeological/cultural sites.
- Detailed mitigations, such as speed limits, noise attenuation berms, or other dust/traffic management efforts will be discussed through the environmental assessment process and further defined during the permitting process.